WORKS ONGOING PROJECTs

SL. NO. Name of Work Name of Company Status Cost of Project
1

Consultancy for S&T works at Hot Metal Track at TATA Steel, Kalinganagar

TATA Steel Limited

Kalinganagar Industrial Complex

Duburi, Jajpur road

Odisha – 755026

DPR and Detailed Design completed. Construction Supervision /PMC in Progress
2

Consultancy for survey of 150 acres of land, preparation of FSR, DPR and construction supervision  for setting up of railway siding in Texmaco Rail land adjacent to Sankrail Railway station of South Easter  Railway

Texmaco Rail & Engineering Ltd.

B.T. Road, Kamarhati, Kolkata – 700 058

Feasibility report submitted to Rly for approval.
3

Preparation of Feasibility report and DPR with detail design for Uniflow MGR system for loading siding of NMDC at Kirandul.

National Mineral Development Corporation, Khanij Bhawan,

Castle Hills, Hyderabad – 500 028

DPR, ESP & LOP Approved. GAD for bridges approved. PSI approved. SIP submitted for approval.
4

Consultancy for survey and preparation of DPR for the proposed railway siding at Hatiwar station of  Katihar Division of N. F. Railway

J. K. Lakshmi Cement Ltd.

Jamal Road

Gandhi Maidan, Patna, Bihar-800001

Survey work completed. Report prepared and sent to client.
5

Consultancy for survey and preparation of Feasibility Report and DPR for Thakur Prasad Sao & Sons at Jharsuguda, Odisha

M/s Thakur Prasad Sao & Sons Pvt. Ltd.

Lahandabhad, Katapali, Jharsuguda, Odisha-868202

Survey work completed. Report prepared and sent to client.
6

Consultancy for survey and preparation of Feasibility Report and DPR for proposed Rly siding  for loading Red Mud at Muri, Ranchi, Jharkhan

M/s Hindulco Industries Ltd.

Muri, Ranchi – 835101, Jharkhan.

Survey work completed. Feasibility report submitted to client.
7

Consultancy for survey, preparation of Feasibility Report and DPR and approval from Railway for Time Motion Study of Railway siding for 2x600 MW ATPP, Anuppur (MP)

MB Power (Madhya Pradesh) Ltd.

239, Okhla Industrial Estate, Phase-3, New Delhi-110020

Survey work is in progress.
8

Final Location survey and preparation of land plan for construction of a new BG line from Chowrigacha to Sainthia (56.0 Km)

CAO/CON/Eastern Railway

14, Strand Road, Kolkata-700001

Survey work completed. Alignment plan 20 Km completed and approved.