| SL. NO. | Name of Work | Name of Company | Status | Cost of Project |
|---|---|---|---|---|
| 1 | Consultancy work for preparation of Joint Feasibility Report (JFR), General Arrangement drawing (GAD), Detailed Project Report, Land Plan and soil investigation for construction of 11 no. ROB in lieu of LC No.16,9,37,24, 46, 31, 41,34,15,50 and 22A under jurisdiction of Sr.DEN/1/SEE of Sonpur Division under CPM/GS/SEE of East Central Railway. |
East Central Railway, |
Drone survey, Astrophotography, Alignment plan submitted for approval | |
| 2 | Consultancy for for Preparation of GAD (ROB Proper & Combined GAD), structural drawings, design calculations, soil exploration, preparation of land plan required for acquisition utility shifting drawing etc for Road Over Bridge(ROB Proper & approaches) over railway track in lieu of LC No.49/Spl in between Chamagram &Khaltipur stations in Malda division. |
Eastern Railway, |
Topographical survey & DGPS survey completed. GAD, DPR submitted. | |
| 3 | Consultancy for Feasibility study and detailed project report for elimination of 27 nos Level Crossing in Main line by provision of ROB/RUB under the jurisdiction of DEN/I/LMG &DEN/GHY. |
North Frontier Railway Lumding Division, Guwahati, Assam |
Survey work completed. Alignment Plans with concept report submitted to Railway. | |
| 4 | Consultancy services for revised DPR & DE for linking of MGR of Hurra-C Mines with existing Kahalgaon MGR line for Kahalgaon Super Thermal Power station Stage-II and for obtaining approval from Railway. |
NTPC Limited (A Govt. of India Enterprise) |
DRP,ESP, Bridge drawings etc. prepared and submitted and awaiting for approval. | 200 Crores |
| 5 | Consultancy for detail survey, DPR, ESP & Project Management for proposed GCT till commissioning for the proposed project at Janai road of Howrah Division of Eastern Railway, Kolkata |
SFA Logistics Park Pvt. Ltd. |
All works completed, now PMC work going on | 70 Crores |
| 6 | Design, Supply, erection, testing & commissioning of 50Hz single phase 25 kV AC OHE at Belur Station for direct movement of EMU trains from Belur to Belurmath and Belur to Howrah. |
Eastern Railway Sr.DEE/TRD, |
OHE work completed. Replacement of bracket assembly not yet finalized by Railway. | 0.7 Crore |
| 7 | Laying of ROB on Howrah-Tarakeswar section and OHE modification in connection with proposed ROB between Dankuni and Belanagar of Howrah division of Eastern Railway. |
Eastern Railway Sr.DEE/TRD, |
Final bill submitted for balance amount. | 0.97 Crore |
| 8 | Track maintenance work for 2 years, 2023-24 & 2024-25 of IOCL siding at Haldia Refinery. |
IOCL, Haldia Refinery, West Bengal |
1.86 Crore | |
| 9 | Carrying out Final Location Surveys for Construction of Proposed ROR between (i)Bachhwara (BCA)-Teghra (TGA) - (approx-9.0Km), (ii)Teghra (TGA)-Dinkargram Simaria(DKGS) - (approx-15.0Km), (iii) at Khagaria (KGG) station - (approx-4.0Km) & (iv) at Mansi (MNE) station - (approx-5.0Km), (v) at Darbhanga (DBG) station - (approx-20.0Km) and Samastipur (SPJ) Bye-Pass - (approx-16.0km) (Total-69.00 Km) in Sonpur/SamastipurDivision of East Central Railway. | East Central Railway, |
Survey work completed. Alignment Plans with concept report submitted to Railway. |