SL. NO. | Name of Work | Name of Company | Status | Cost of Project |
---|---|---|---|---|
1 | Consultancy for S&T works at Hot Metal Track at TATA Steel, Kalinganagar |
TATA Steel Limited Kalinganagar Industrial Complex Duburi, Jajpur road Odisha – 755026 |
DPR and Detailed Design completed. Construction Supervision /PMC in Progress | |
2 | Consultancy for survey of 150 acres of land, preparation of FSR, DPR and construction supervision for setting up of railway siding in Texmaco Rail land adjacent to Sankrail Railway station of South Easter Railway |
Texmaco Rail & Engineering Ltd. B.T. Road, Kamarhati, Kolkata – 700 058 |
Feasibility report submitted to Rly for approval. | |
3 | Preparation of Feasibility report and DPR with detail design for Uniflow MGR system for loading siding of NMDC at Kirandul. |
National Mineral Development Corporation, Khanij Bhawan, Castle Hills, Hyderabad – 500 028 |
DPR, ESP & LOP Approved. GAD for bridges approved. PSI approved. SIP submitted for approval. | |
4 | Consultancy for survey and preparation of DPR for the proposed railway siding at Hatiwar station of Katihar Division of N. F. Railway |
J. K. Lakshmi Cement Ltd. Jamal Road Gandhi Maidan, Patna, Bihar-800001 |
Survey work completed. Report prepared and sent to client. | |
5 | Consultancy for survey and preparation of Feasibility Report and DPR for Thakur Prasad Sao & Sons at Jharsuguda, Odisha |
M/s Thakur Prasad Sao & Sons Pvt. Ltd. Lahandabhad, Katapali, Jharsuguda, Odisha-868202 |
Survey work completed. Report prepared and sent to client. | |
6 | Consultancy for survey and preparation of Feasibility Report and DPR for proposed Rly siding for loading Red Mud at Muri, Ranchi, Jharkhan |
M/s Hindulco Industries Ltd. Muri, Ranchi – 835101, Jharkhan. |
Survey work completed. Feasibility report submitted to client. | |
7 | Consultancy for survey, preparation of Feasibility Report and DPR and approval from Railway for Time Motion Study of Railway siding for 2x600 MW ATPP, Anuppur (MP) |
MB Power (Madhya Pradesh) Ltd. 239, Okhla Industrial Estate, Phase-3, New Delhi-110020 |
Survey work is in progress. | |
8 | Final Location survey and preparation of land plan for construction of a new BG line from Chowrigacha to Sainthia (56.0 Km) |
CAO/CON/Eastern Railway 14, Strand Road, Kolkata-700001 |
Survey work completed. Alignment plan 20 Km completed and approved. |