SL. NO. | Name of Work | Name of Company | Status | Cost of Project |
---|---|---|---|---|
1 | Feasibility study for Engineering & Traffic Survey of Railway siding for the Orissa Greenfield Project for a 12 MTPA integrated Steel Plant and 1500 MW capacity Power Plant in Keonjhar District, Orissa, in East Coast Rly. |
RITES Limited, Bhubaneswar for M/S ARCELOR Mittal GM/RITES Project office, Bhubaneswar Bhagwan Tower, 1st Floor, Block-A Cuttak Road, Bhubaneswar-751006 |
Completed in 2008 | - |
2 | Consultancy service for design, arrangement and layout drawings and preparing Tender schedule and specification for augmentation work of 200 Loco per year. |
Chittaranjan Locomotive Works Chittaranjan, West Bengal. (Indian Railways) CE/ CLW
|
Completed in 2008 | - |
3 | Preparation of detail design and drawing for Skew slab bridge for a Railway flyover connection with Rail infrastructure at Angul for NALCO in East Coast Railway. |
M/s RITES for NALCO |
Completed in 2009 | Rs. 3.5 Million |
4 | Feasibility Report for setting up of a Wagon Factory with Financial viability |
T.I. Metal Forming, Chennai, Chennai – Tiruvellur High Road, Tiruninravur – 602024 |
Completed in 2010 | Rs.5000.0 Million |
5 | Preparation of design and drawing for construction of 3x12.2 M clear span PSC slab for railway bridge conforming to DFC loading. East coast Rly. |
M/s ARSS Infrastructure Projects Ltd, |
Completed in 2010 | Rs. 15.0 Million |
6 | Consultancy for scheme design, estimate and specification for power supply, Depot layout, Ballast less track for Hyderabad metro consisting of 3 lines having total length of 72 Km. |
M/s Lersen & Toubro Limited, |
Completed in 2010 | This is a pretender consultancy. Cost of Total Metro project was estimated as Rs.1500.0 Billion |
7 | Detail Survey and preparation of DPR for setting up an ICD (Integrated container Depot) at Bandamunda. South Eastern Railway. |
M/s Innovative B2B Logistics Solutions Ltd., |
Completed in 2010 | Rs.70.0 Million. |
8 | Preparation of DPR with financial viability report for Rail infrastructure at Ranital station of S. E. Railway. |
Sridhi Transport Co. Pvt. Ltd., |
Completed in 2010 | Rs. 74.0 Million |
9 | Detail Survey and Technical Feasibility study/Project management services for Rail connectivity work at Container Freight Station, Kolkata. |
M/s Balmer Lawrie |
Completed in 2011 | Rs. 13.4 Million |
10 | Final Location survey for construction of new Rly line from Prantik to Suri (33.987Km) and geotechnical investigation etc. for construction of Flyover at Sainthia in connection with doubling from Chinpai to Sainthia. Eastern Railway |
CAO/CON, Eastern Railway |
Completed in 2011 | Rs. 1360 Million |
11 | Preliminary Engineering survey for construction of new BG line from Krishnanagar – Nabadwipghat (20km) including survey for fixing of alignment for construction of an important bridge over river Bhagirathi‐ in Eastern Rly. |
CAO/CON, Eastern Railway |
Completed in 2011 | Rs. 800.00 Million |
12 | Carrying out Engineering field survey and preparation of Feasibility Report and DPR for a private siding at IKRA in Asansol Division of Eastern Railway. |
M/S Rashmi Cement Ltd. |
Completed in 2011 | Rs. 55.36 Million |
13 | Consultancy service for preparation of DPR with financial analysis for setting up a Foundry shop for Railway Wagon / RS items. |
M/s T. I. Metal Forming, Chennai |
Completed in 2011 | Rs. 260.0 Million |
14 | Final Location survey and preparation of report for construction of new BG Rly line from Dhaniakhali to Magra, Eastern Railway. |
CAO/CON, Eastern Railway |
Completed in 2012 | |
15 | Final Location survey and preparation of report for construction of new BG Rly line from Budge to Pujali, Eastern Railway. |
CAO/CON, Eastern Railway |
Completed in 2012 | |
16 | Consultancy Services for preparation of Feasibility report and DPR in connection with modification and remodeling of Private Railway Siding at Sankrail , S.E. Rly |
M/s Ambuja Cement Ltd. |
Completed in 2013 | Rs. 56.0 Million |
17 | Feasibility Report & DPR for a private siding connecting KASIA mines from |
ESSEL Mining & Industries Ltd. |
Completed in 2013 | Rs. 447.4 Million |
18 | Consultancy for detail Design and drawing for Through Girder span 29.478M for Bridge No.7, span No.5, East Coast Railway |
M/s Rawatsons Engineers Pvt. Ltd. |
Completed in 2013 | Rs. 20.0 Million |
19 | Detail survey and preparation of Feasibility report and DPR for additional line in the Durgapur Cement Works siding at Durgapur, including detail Engineering and construction management in Eastern |
M/s Birla Corporation Ltd., |
Completed in 2014 | Rs. 26.26 Million |
20 | Consultancy services for survey and preparation of DPR for Common facility work including detail design and drawing at GUA in South Eastern Railway |
M/s Jindal Steel and Power Ltd. |
Completed in 2014 | Rs. 400.0 Million |
21 | Consultancy for survey and preparation of DPR for proposed Phase‐1 Railway siding extension of Birarajpur station in Chakradharpur Division of South Eastern Railway. |
Adhunik Power & Natural Resources Ltd. |
Completed in 2015 | Rs. 30.0 Million |
22 | Consultancy for detail survey and preparation of DPR for proposed PFT at Kalunga in CKP Div of South Eastern Railway |
Sri Mahabir Ferro Alloys Pvt. Ltd. |
Completed in 2015 | Rs. 28.0 Million |
23 | Consultancy service for the proposed Two spur unloading siding of HPCL at Budge Budge in Sealdah Division of Eastern Railway. Detail survey and preparation of DPR. |
Hindustan Petroleum |
Completed in 2015 | Rs. 74.1 Million |
24 | Detail Engineering survey and preparation of DPR and Project Management Services for setting up Railway tank wagon siding at IOCL’s Paradeep Lighterage Terminal, Paradeep (Orissa). East Coast Rly, Indian Railway. |
Indian oil Coorporation Ltd. Engineering Department,, 6th Floor, Indian Oil Bhawan,g-9, Ali Yavar Yang, Bandra (East), Mumbai-400 051. India. |
Completed in 2015 | 68.6 Millions |
25 | Detail survey and preparation of Feasibility report and DPR for Private Freight Terminal at Gobra in Eastern Railway |
M/s SFA Logistics Park Pvt. Ltd. |
Completed in 2016 | Rs. 1500.0 Million |
26 | Project Management consultancy for construction and commissioning of siding at Andal under Eastern Railway. |
M/s Birla Corporation Ltd. |
Completed in 2016 | Rs. 40.0 Million |
27 | Consultancy services for survey and preparation of Feasibility Report, DPR, Detail Engineer, and Project Management & Supervision. |
M/s JSW Cement Ltd. |
Completed in 2017 | Rs. 300.0 Million |
28 | Consultancy services for preparation of detail survey, Feasibility Report and DPR for construction of Brown field PFT at Nipania under Raipur Division of South East Central Railway. |
M/s Suman Forwarding Agency, |
Completed in 2017 | Rs. 60.0 Million |
29 | Consultancy for survey & preparation of Feasibility Report, DPR, ESP for Railway siding at Barajamda of South Eastern Railway. |
M/s Deepak Steel & Power Ltd. |
Completed in 2018 | Rs. 40.0 Million |
30 | Certification of Track & Bridges of private Railway siding of M/s TATA Steel at JODA (East) JMTC siding between Murga Mahadev Road and Banspani, Chakradhapur Division of South Eastern Railway for 25 Axle Load. |
M/s E to E Transportation Infrastructure Pvt. Ltd. |
Completed I n 2018 | |
31 | Consultancy for proposed modification to Private Railway siding at Nimpura - Gokulpur and conversion to PFT in South Eastern Railway |
M/S Rashmi Cement Ltd. |
Completed in 2018 | Rs. 25.8 Million |
32 | Modification of existing Siding of SAIL at Meghahatuburu in South Eastern Railway for provision of EIMWB. |
STEEL AUTHORITY OF INDIA LTD. (A Govt. of India Undertaking) Raw Material Division, Meghahatuburu Iron Ore Mine, Dist- Singhbhum (West), Jharkhand-833223. |
Completed in 2018 | Rs. 10.0 Millions |
33 | MEP Design consultancy works of Central Park Depot of East-West Metro for KMRCL project at Kolkata consisting of detail design of Electric lighting, Air Conditioning and Ventilation, Fire Fighting, Water Supply and Diagram scheme for Central Depot of Metro Railway |
M/s Consolidated Construction Consortium Ltd.( CCCL), Chennai. |
Completed in 2018 | 1560.0 millions |
34 | Consultancy work for Project Management & construction supervision and preparation of revised estimates, Completion drawings, Siding Agreement, Land Licensing Agreement and execution of the same, for Rungta Mines siding between Jaroli-Nayagarh under South Eastern Railway. |
M/s Rungta Mines Limited Jaiang Iroin & Manganese Mines, Keonjhar, -758052 State- Odisha. |
Completed In 2018 | Rs.25.8 millions |
35 | Consultancy for survey, preparation of Feasibility Report, DPR,, Detail Engineering, BOQ, Tender documents for modification/augmentation of the existing siding of TATA Metaliks at Gokulpur in Kharagpur Division of South Eastern Railway. |
TATA Metaliks Limited Vill-Mahespur, PO-Samraipur Kharagpur, West Bengal-721 301 |
Completed in 2018 | 103.4 millions |
36 | Consultancy for resurvey of the additional area/land in Bada-Khirbani village and modification of DPR of Hurra-C mines with existing MGR of NTPC, Kahalgaon Eastern Rly. |
NTPC Limited, Kahalgaon Super Thermal Power project Bhagalpur, Bihar |
Completed in 2019 | Rs.45.3. millions |
37 | Consultancy services of Mechanical Workshop, Samastipur for augmentation of manufacture of BOXNHL MBS wagon, East Central Railway |
Chief Workshop Manager |
Completed in October,2019 | Rs.103.35 crores. |
38 | Consultancy for preparation Feasibility report, DPR, Detail design, Preparation of OHE layout & Signaling layout and Land Licensing Plan for development of private siding at Nimpura- Gokkulpur under South Eastern Railway. |
M/s Orissa Metaliks Pvt Ltd. |
Completed in 2020 | Rs. 56.9 Millions |
39 | Consultancy for preparation Feasibility report, DPR, Detail design, Preparation of OHE layout & Signalling layout and Land Licensing Plan for development of private siding at Nimpura – Gokulpur under South Eastern Railway |
M/S Orissa Manganese and Power Ltd. 1, Grastin Place, ORBIT House, 3rd floor, Room No.3B, Kolkata-700001 |
Completed in 2020 | Rs.56.9 Millions |
40 | Consultancy for survey, preparation of Feasibility Report and DPR and approval from Railway for development of a Coal Loading siding of WBPDCL at Panchra |
WBPCDL, Bidyut Unnayan Bhavan, 3/C Block –LA, Secrtor-3 Salt lake City, Kolkata -7000106 West Bengal. |
Completed in 2020 | 10.50 lakhs |
41 | Consultancy Services for survey and preparation of Feasibility report and DPR for augmentation of existing BRMS siding of M/s Bisra Stone Lime Company Ltd. Birmitrapur, in Chakradharpur Division of S. E. Railway. |
The Bisra Stone Lime Company Ltd. ( A Govt. of India Enterprise), Birmitrapur, Sundargarh, Odisha |
Completed in 2021 | RS. 8 Lakhs |