WORKS COMPLETED PROJECTs

SL. NO. Name of Work Name of Company Status Cost of Project
1

Feasibility study for Engineering & Traffic Survey of Railway siding for the Orissa Greenfield Project for a 12 MTPA integrated Steel Plant and 1500 MW capacity Power Plant in Keonjhar District, Orissa, in East Coast Rly.

RITES Limited, Bhubaneswar for M/S ARCELOR Mittal

GM/RITES

Project office, Bhubaneswar Bhagwan Tower, 1st Floor, Block-A Cuttak Road, Bhubaneswar-751006

Completed in 2008 -
2

Consultancy service for design, arrangement and layout drawings and preparing Tender schedule and specification for augmentation work of Loco Shed for increasing production to 200 Loco per year.

Chittaranjan Locomotive Works Chittaranjan, West Bengal. (Indian Railways)

CE/ CLW

Completed in 2008 -
3

Preparation of detail design and drawing for Skew slab bridge for a Railway flyover connection with Rail infrastructure at Angul for NALCO in East Coast Railway.

M/s RITES for NALCO
GM/ RITES, Kolkata

Completed in 2009 Rs. 3.5 Million
4

Feasibility Report for setting up of a Wagon Factory with Financial viability with detail layout plan & estimate including test of equipments.

T.I. Metal Forming, Chennai,  Chennai – Tiruvellur High Road, Tiruninravur – 602024

Completed in 2010 Rs.5000.0 Million
5

Preparation of design and drawing for construction of 3x12.2 M clear span PSC slab for railway bridge conforming to DFC loading. East coast Rly.

M/s ARSS Infrastructure Projects Ltd,
Sector‐A, Zone‐D, Plot‐38
Mancheswar Industrial Estate
Bhubaneswar‐751010, Orissa

Completed in 2010 Rs. 15.0 Million
6

Consultancy for scheme design, estimate and specification for power supply, Depot layout, Ballast less track for Hyderabad metro consisting of 3 lines having total length of 72 Km.

M/s Lersen & Toubro Limited,
Mount Poonamallee Road,
Manapakkam,
PB No.979,
Chennai – 6000089.

Completed in 2010 This is a pretender consultancy. Cost of Total Metro project was estimated as Rs.1500.0 Billion
7

Detail Survey and preparation of DPR for setting up an ICD (Integrated container Depot) at Bandamunda. South Eastern Railway.

M/s Innovative B2B Logistics Solutions Ltd.,
11th Floor, DLF Tower, 9-B, DLF Cyber City,
Phase-III, Sector- 25A,
Gurgaon - 122002.

Completed in 2010 Rs.70.0 Million.
8

Preparation of DPR with financial viability report for Rail infrastructure at Ranital station of S. E. Railway.

Sridhi Transport Co. Pvt. Ltd.,
Crystal Tower, Kaveri Road,
Sakchi,
Jamshedpur‐831 001.

Completed in 2010 Rs. 74.0 Million
9

Detail Survey and Technical Feasibility study/Project management services for Rail connectivity work at Container Freight Station, Kolkata.

M/s Balmer Lawrie
(A Govt. of India, UT),
21, Netaji Subhas Road,
Kolkata – 700001

Completed in 2011 Rs. 13.4 Million
10

Final Location survey for construction of new Rly line from Prantik to Suri (33.987Km) and geotechnical investigation etc. for construction of Flyover at Sainthia in connection with doubling from Chinpai to Sainthia. Eastern Railway

CAO/CON, Eastern Railway
14, Strand Road,
Kolkata – 700 001

Completed in 2011 Rs. 1360 Million
11

Preliminary Engineering survey  for  construction of new BG line  from  Krishnanagar – Nabadwipghat (20km) including survey for fixing of alignment for construction of an important bridge over river Bhagirathi‐ in Eastern Rly.

CAO/CON, Eastern Railway
14, Strand Road,
Kolkata – 700 001

Completed in 2011 Rs. 800.00 Million
12

Carrying out Engineering field survey and preparation of Feasibility Report and DPR for a private siding at IKRA in Asansol Division of Eastern Railway.

M/S Rashmi Cement Ltd.
Premlata Building, 6th Floor,
Shakespear sarani,
Kolkata‐700017

Completed in 2011 Rs. 55.36 Million
13

Consultancy service for preparation of DPR with financial analysis for setting up a Foundry shop for Railway Wagon / RS items.

M/s T. I. Metal Forming, Chennai
Chennai – Tiruvellur High Road
Tiruninravur – 602024

Completed in 2011 Rs. 260.0 Million
14

Final Location survey and preparation of report for construction of new BG Rly line from Dhaniakhali to Magra, Eastern Railway.

CAO/CON, Eastern Railway
14, Strand Road,
Kolkata – 700 001

Completed in 2012
15

Final Location survey and  preparation  of  report for construction of new BG Rly line from Budge to Pujali, Eastern Railway.

CAO/CON, Eastern Railway
14, Strand Road,
Kolkata – 700 001

Completed in 2012
16

Consultancy Services for preparation of Feasibility report and DPR in connection with modification and remodeling of Private Railway Siding at Sankrail , S.E. Rly

M/s Ambuja Cement  Ltd.
Kolkata office ”Indicon Viva" 
53A Lila Roy Sarani,
Kolkata‐700019

Completed in 2013 Rs. 56.0 Million
17

Feasibility Report & DPR for a private siding connecting KASIA mines from
BARBIL-BOLANI in S. E. Railway.

ESSEL Mining & Industries Ltd.
Barbil -758 035,
Keonjhar, Orissa

Completed in 2013 Rs. 447.4 Million
18

Consultancy for detail Design and drawing for Through Girder span 29.478M for Bridge No.7, span No.5, East Coast Railway

M/s Rawatsons Engineers Pvt.  Ltd.
18A, Park Street,
Kolkata – 700071

Completed in 2013 Rs. 20.0 Million
19

Detail survey and preparation of Feasibility report and DPR for additional line  in  the  Durgapur Cement Works siding at Durgapur, including detail Engineering and construction management in Eastern

M/s Birla Corporation Ltd.,
Unit : Durgapur Cement Works,
Durgapur – 713 203.

Completed in 2014 Rs. 26.26 Million
20

Consultancy services for survey  and  preparation of DPR for Common facility work including detail design and drawing at GUA in South Eastern Railway

M/s Jindal Steel and Power Ltd.
Ranchi,
Jharkhand.

Completed in 2014 Rs. 400.0 Million
21

Consultancy for survey and preparation of DPR for proposed Phase‐1 Railway siding extension of Birarajpur station in Chakradharpur Division of South Eastern Railway.

Adhunik Power & Natural Resources Ltd.
Lansdowne Tower,
2/1, Sarat Bose Road
Kolkata ‐ 700020

Completed in 2015 Rs. 30.0 Million
22

Consultancy for detail survey and preparation of DPR for proposed PFT at Kalunga in CKP Div of South Eastern Railway

Sri Mahabir Ferro Alloys Pvt. Ltd.
10C, Hungerford street,
6th floor,
Picasso Bithi,
Kolkata – 700017

Completed in 2015 Rs. 28.0 Million
23

Consultancy service for the proposed Two spur unloading siding of HPCL at Budge  Budge  in Sealdah Division of Eastern Railway. Detail survey and preparation of DPR.

Hindustan Petroleum
Corporation Ltd.
1, Graham Road,
Budge Budge,
Kolkata – 700 137

Completed in 2015 Rs. 74.1 Million
24

Detail Engineering survey and preparation of DPR and Project Management Services for setting up Railway tank wagon siding at IOCL’s Paradeep Lighterage Terminal, Paradeep (Orissa). East Coast Rly, Indian Railway.

Indian oil Coorporation Ltd. Engineering Department,, 6th Floor, Indian Oil Bhawan,g-9, Ali Yavar Yang, Bandra (East), Mumbai-400 051. India.

Completed in 2015 68.6 Millions
25

Detail survey and preparation of Feasibility report and DPR for Private Freight Terminal at Gobra in Eastern Railway

M/s SFA Logistics Park Pvt. Ltd.
76, GT Road,
Howrah, Kolkata,
West Bengal.

Completed in 2016 Rs. 1500.0 Million
26

Project Management consultancy for construction and commissioning of siding at Andal under Eastern Railway.

M/s Birla Corporation Ltd.
Unit‐Durgapur Cement works,
Durgapur‐713 203,
West Bengal.

Completed in 2016 Rs. 40.0 Million
27

Consultancy services for survey and preparation of Feasibility Report, DPR, Detail Engineer, and Project Management & Supervision.

M/s JSW Cement Ltd.
Ankur Comples, Vill‐Jambedia,
Po‐ Sayaedpur via Salboni,
Dist‐ Midnapur,
West Benvgal‐721147

Completed in 2017 Rs. 300.0 Million
28

Consultancy services for preparation of detail survey, Feasibility Report and DPR  for construction of Brown field PFT at Nipania under Raipur Division of South East Central Railway.

M/s Suman Forwarding Agency,
Kolkata
for M/s Lafarge India Ltd.

Completed in 2017 Rs. 60.0 Million
29

Consultancy for survey & preparation of Feasibility Report, DPR, ESP for Railway siding at Barajamda of South Eastern Railway.

M/s Deepak Steel & Power Ltd.
Ispat Bhawan,
PO‐ Barbil‐758035,
Dist‐Keohnjhar,
State‐ Odisha.

Completed in 2018 Rs. 40.0 Million
30

Certification of Track & Bridges of private Railway siding of M/s TATA Steel at JODA (East) JMTC siding between Murga Mahadev Road and Banspani, Chakradhapur Division of South Eastern Railway for 25 Axle Load.

M/s  E to E  Transportation Infrastructure Pvt. Ltd.
Amrutha Varshini
325, 3rd Cross, Sector – A
Yelahanka New Town
Bengaluru – 560 064

Completed I n 2018
31

Consultancy for proposed modification to Private Railway siding at Nimpura - Gokulpur and conversion to PFT in South Eastern Railway

M/S Rashmi Cement Ltd.
Premlata Building, 6th Floor,
Shakespear sarani,
Kolkata‐700017

Completed in 2018 Rs. 25.8 Million
32

Modification of existing Siding of SAIL at Meghahatuburu in South Eastern Railway for provision of EIMWB.

STEEL AUTHORITY OF INDIA LTD.

(A Govt. of India Undertaking) Raw Material Division, Meghahatuburu Iron Ore Mine,

Dist- Singhbhum (West), Jharkhand-833223.

Completed in 2018 Rs. 10.0 Millions
33

MEP Design consultancy works of Central Park Depot of East-West Metro for KMRCL project at Kolkata consisting of  detail design of Electric lighting, Air Conditioning and Ventilation, Fire Fighting, Water Supply and Diagram scheme for Central Depot of Metro Railway

M/s Consolidated Construction Consortium Ltd.( CCCL), Chennai.

Completed in 2018 1560.0 millions
34

Consultancy work for Project Management & construction supervision and  preparation of revised estimates, Completion drawings, Siding Agreement, Land Licensing Agreement and execution of the same,  for Rungta Mines siding between  Jaroli-Nayagarh under South Eastern Railway.

M/s Rungta Mines Limited

Jaiang Iroin & Manganese Mines, Keonjhar, -758052 State- Odisha.

Completed In 2018 Rs.25.8 millions
35

Consultancy for survey, preparation of Feasibility Report, DPR,, Detail Engineering, BOQ, Tender documents for modification/augmentation of the existing siding of TATA Metaliks at Gokulpur in Kharagpur Division of South Eastern Railway.

TATA Metaliks Limited

Vill-Mahespur, PO-Samraipur

Kharagpur, West Bengal-721 301

Completed in 2018 103.4 millions
36

Consultancy services of Mechanical Workshop, Samastipur for  augmentation  of  manufacture of BOXNHL MBS  wagon,             East Central Railway

Chief Workshop Manager
Mechanical Workshop,
East Central Railway
Samastipur
PIN-848101

Completed in October,2019 Rs.103.35 crores.
37

Consultancy for preparation Feasibility report, DPR, Detail design, Preparation of OHE layout & Signaling layout and Land Licensing Plan for development of private siding at Nimpura- Gokkulpur under South Eastern Railway.

M/s Orissa Metaliks Pvt Ltd.
1, Garstin Place, ORBIT house,
3rd floor, Room No. 3B
Kolkata – 700 001

Completed in 2020 Rs. 56.9 Millions
38

Consultancy for preparation Feasibility report, DPR, Detail design, Preparation of OHE layout & Signalling layout and Land Licensing Plan for development of private siding at Nimpura – Gokulpur under South Eastern Railway

M/S Orissa Manganese and  Power Ltd. 

1, Grastin Place, ORBIT House, 3rd floor, Room No.3B,

Kolkata-700001

Completed in 2020 Rs.56.9 Millions
39

Consultancy for survey, preparation of Feasibility Report and DPR and approval from Railway for development of a Coal Loading siding  of WBPDCL at Panchra

WBPCDL, Bidyut Unnayan Bhavan, 3/C Block –LA, Secrtor-3

Salt lake City, Kolkata -7000106

West Bengal.

Completed in 2020 10.50 lakhs
40 Consultancy for survey, preparation of Feasibility Report and DPR and approval from Railway for Time Motion Study of Railway siding for 2x600 MW ATPP, Anuppur (MP).

MB Power (Madhya Pradesh) Ltd. 239, Okhla Industrial Estate, Phase-3, New Delhi-110020

Completed in 2021
41

Consultancy Services for survey and preparation of Feasibility report and DPR for augmentation of existing BRMS siding of M/s Bisra Stone Lime Company Ltd. Birmitrapur, in Chakradharpur Division of S. E. Railway.

The Bisra Stone Lime Company Ltd. ( A Govt. of India Enterprise), Birmitrapur, Sundargarh, Odisha

Completed in 2021 RS. 8 Lakhs
42 Independent Engineer for Chattisgarh East West Railway Ltd (CEWRL) for Gevra Rd to Pendra Rd (Double Line) Km 0.0 to Km.11.51 Urga to Kushmunda (Single Line) plus 44.654 Km long connectivity(including Kushmunda, Junadihm Dipka, Saraipali, Kartali, Ambika & Vijaya West (Single Line) Chattisgarh East-West Railway Limited, (A Govt of. India Undertaking) 2nd flor, CSIDC Commercial Complex, Mahadev Ghat Road, Raipura Chowk, Raipur (C.G) – 492013. Completed in 2022 103.4 millions
43 Preparation of Feasibility report and DPR with detail design for Uniflow MGR system for loading siding of NMDC at Kirandul.Chhatisgarh, in East Coast Railway. National Mineral Development Corporation, Khanij Bhawan, Castle Hills, Hyderabad – 500 028 Completed in 2022 6237.64 lakhs
44 Consultancy for preparation of ESP and Project Detail for proposed siding at Jakpur Station of Kharagpur Division in South Eastern Railway M/s. Orissa Alloy Steel Pvt Ltd, 1, Garstin Place, ORBIT House, Kolkata – 700001 Completed in 2022 50 Crore
45

Proposed GCT terminal for M/s Times Steel and Power Private Limited taking off from Kalunga Station of Chakradharpur Division in S.E.Railway. Detail survey, DPR, ESP, Detailed Engineering.

M/s. Time Steel and Power Private Limited., Dua Complex Panposh Road,Rourkella – 769004 Odisha.

Completed in 2022 23 Crore
46 Consultancy for Techno Economic Feasibility report for production of Manufacture spares for Railway Wagons & Coaches.

M/s. Maxlux Glass Pvt Ltd.,
Anandlok, 1st floor,
227, A.J.C. Bose Road,
Kolkata – 700020

Completed in 2022 16 Crore
47 Consultancy for detail design & drawing in Ballast less track at Silo Area at NTPC/KahalgaonNTPC Limited, Kahalgaon Super Thermal Power project Bhagalpur, Bihar.

NTPC Limited, Kahalgaon Super Thermal Power project Bhagalpur, Bihar.

Completed in 2022 50 Lakhs
48 Pre-Bid Engineering Consultancy Services for Construction of New Broad Gauge Rly line between Ch.8.020 & Ch.l 48.000 including Rly Electrification, S&T works and Genl Elec Services between Koteganguru(Excl) & Shikaripura(Incl) stations in Shivamogga Shikaripura-Ranebennur New Line Project in the S.W.Rly HGIEL, 14, Panchavati Colony, Ratanada, Jodhpur- 342001 Completed in 2022 450 Crore
49 Pre-Bid Engineering Consultancy Services for Construction and Commissioning of Chandigarh-Baddi New Broad Gauge Rly Line ( 30.295 Km Ch. 2219 m to 28076m ) including Electrification and S&T Works on EPC Mode. HGIEL, 14, Panchavati Colony, Ratanada, Jodhpur- 342001 Completed in 2022 397 Crore
50 Pre-bid consultancy services for Construction of new BG Railway Line Project from Murkongselek station in the state of Assam (Ch:0.780 Km) to prosed Pasighat station in the state of Arunachal Pradesh (Ch: 27.062 Km) including Electrical (General), Signal & Telecommunication works”

SCL Infratech Limited
8 – 2-502/1A, 1st Floor,
“Jivi Towers” Road No.
7, Banjara Hills,
Hyderabad - 500034

Completed in 2022 402 Crore
51 Construction of Gati Shakti Multi Modal Cargo Terminal entirely on Railway Land at Sankrail Goods Terminal Yard (SGTY). Howrah

M/s. Balmer Lawrie & Co Ltd, 21,
Netaji Subhas road,
Kolkata – 700001, India.

Completed in 2022 12 Crore
52 Consultancy for detail survey, preparation of DPR, ESP, GAD, Engineering details and approval from Railway . Project Management Consultancy for Railway Siding Works at Kalaburagi Depot, Karnataka. Taking Off from Hirenanduru Station of Sholapur Division of Central Railway.

Bharat Petroleum Corporation Ltd, “A” Installation Sewree Fort Road, Sewree (East), Mumbai- 400015

Completed in 2023 52.0 crores.
53 Engagement of Consultant for Designing and PMC (Project Management Consultancy) Services for Refuishment of Railway Siding and Open Yard at WD SONAPUR, KOLKATA, Shyama Prasad Mukherjee Port, Eastern Railway.

M/s. Balmer Lawrie & Co Ltd, 21,
Netaji Subhas road,
Kolkata – 700001, India.

Completed in 2023 7.0 crores
54 Consultancy for development of Gati Shakti Terminal at Baihata Railway station in N. F. Railway for new private siding in the name of B.R. Transcon LTD.

B. R. Transcon Limited
Kshudrapalaha, Baihata,
Kamrup, Assam - 781381

Completed in 2023 20.0 Crores
55 Consultancy for S&T works at Hot Metal Track at TATA Steel, Kalinganagar, East Coast Railway which include Preparation of SIP, DPR, Scheme Design, Route Control Chart (RCC), Cable Core Plan, Cable Route Plan, Cable Termination Plan, Power supply scheme, Track bonding plan, Circuit Diagram, BOQ & Specification, Detailed estimate, Construction & Supervision & As built drawing.

TATA Steel Limited
Kalinganagar Industrial Complex Duburi,
Jajpur road Odisha – 755026

Completed in 2023 57 Crores
56 Consultancy for survey of 150.0 acre of land, preparation of FSR, DPR and construction supervision for setting up of railway siding in Texmaco Rail land adjacent to Sankrail Railway station of South Eastern Railway.

Texmaco Rail & Engineering Ltd.
B.T. Road, Kamarhati,
Kolkata-700058

Completed in 2023 82 Crores
57 Consultancy for site survey, study of existing system of operation, development of concept plan, study of OHE and S&T requirement, preparation of estimate, preparation of Feasibility Report for proposed Goods Shed, siding for loading of Coal near Kurwa Railway Station in Dumka – Rampurhat line of Howrah Division in Eastern Railway and approval from Railway, including Detail design and Construction Supervision.

BGR Mining & Infra Ltd.,
Road No.10, Banjara Hills,
Hyderabad – 500034,
Telengana Under Eastern Railway

Completed in 2023 38 Crores
58 Setting up of a proposed Gati Shakti Multi Modal Cargo Terminal taking off from BERO Station in ADRA Division of South Eastern Railway.

Captain Steel India Ltd.
0A, Shakespeare Court, 21A,
Shakespeare Sarani Rd,
Kankaria Estates,
Park Street area, Kolkata,
West Bengal 700017

Completed in 2023 47 Crores
59 Consultancy for survey, preparation of Feasibility Report, DPR and approval from Railway including Project Management for Railway Siding from Baktarnagar – Andal Link Line under Asansol Division of Eastern Railway.

Howrah Gases Limited
 – Crooked lane,
Kolkata – 700069
West Bengal

Completed in 2023 14 Crores
60 Conducting Final Location Survey, Traffic Survey, submission of comprehensive DPR for all Civil, Electrical and S&T work, preparation of detail estimate along with Alignment Plan, Yard Plan, drawing for minor bridges, major bridges, ROB/RUB, FOB, Level Crossing drawings, Hydrological & Geotechnical Investigation and all other ancillary works at following locations: (i) Bypass line at Rupsa (Kharagpur to Baripada) (Item No. 33) (10 km), (ii) Flyover from Rakha Mines to Asanboni up line to joint line (5 km), (iii)Flyover from Panskura east outer (Raghunathbari end) to Panskura (5 km) under the jurisdiction of CPM/GSU/KGP of South Eastern Railway.

South Eastern Railway,
Kharagpur Division
West Bengal

Completed in 2024 1800 Crores
61 Construction of all civil works for extension of private Railway siding within Railway land at Birarajpur station in Chakradharpur. The work consisted of earthwork in formation, blanketing, concrete work in retaining wall, drains and Construction of Railway Under bridge. The work also included procurement of ballast, P.way material along with laying and linking of track Including commissioning.

M/s Adhunik Power & Natural Resources Ltd.
“Lansdowne Tower” 2/1A,
Sarat Bose Road,
Kolkata – 700020
Ph. 033-30517100

Completed in 2016
62 Construction of all civil works for augmentation of Private Railway siding of Birla Corporation Limited. The work consisted of earthwork in formation, blanketing, bridge construction RCC 3x6.1m, laying of track and commissioning the same along with inter locking signalling works. The work also included OHE and power supply work required for electrification of the yard.

M/s Birla Corporation Ltd.
Durgapur Cement Works Birla Building,
9/1, R.N. Mukherjee Road,
Kolkata – 700001 Ph. 033-22131680

Completed in 2017
63 Supply & erection of 25 KV Over Head Electrification & Switching station for private Siding of M/s JSW Cement Ltd. including Block station between Godapiasal & Salboni, Adra Division of South Eastern Railway. Full Electrification works for a new Railway siding of JSW Cement at Salboni, Medinipur Dist. Of West Bengal.

M/s JSW Cement Ltd.
Bandra Kurla Complex,
Near MMRDA Grounds,
Bandra East, Mumbai –400051

Completed in 2018
64 Consultancy and construction work for a private railway siding of IOCL at Haldia, West Bengal Turn key work of preparation of DPR report, detail drawings for construction of Private Railway Siding involving formation, blanketing, track work etc. at Haldia in West Bengal for IOCL project at Haldia under principal Contractor L&T.

M/s. L&T
11th floor,
Tower–2, DP-5,
Sector-V,Salt Lake City

Completed in 2019 4.3 Crores
65

Maintenance of Track for 2 years, 2021-22 & 2022-23

M/s IOCL, Haldia Refinary
PO-Haldia Oil Refinary-721606
Purba Medinipur, West Bengal,

Completed in 2023 1 Crore
66

Provision of OHE in connection with capacity enhancement at Barharwa Railway siding

Sr.DEE(TRD) Eastern Railway, Malda Completed in 2024 1.25 Crore
67 Track Maintenance, Miscellaneous P.Way(Zonal)/ Track works for the period from 01.10.2022 to 30.09.2024 in the section of SSE/P.Way/GII under the jurisdiction of ADEN/JHARGRAM.

South Eastern Railway ,Kharagpur division-Engg,
West Bengal. Indian Railway

Completed in 2024 1.04 Crore
68 Miscellaneous P.Way(Zonal)/ Track works for the period from 01.10.2022 to 30.09.2024 in the section of SSE/P.Way/JGM under the jurisdiction of ADEN/JHARGRAM.

South Eastern Railway ,
Kharagpur division-Engg,
West Bengal. Indian Railway

Completed in 2024 0.82 Crore