WORKS COMPLETED PROJECTs

SL. NO. Name of Work Name of Company Status Cost of Project
1

Feasibility Report for setting up of a Wagon Factory with Financial viability

M/s T.I. Metal Forming,
Chennai Chennai – Tiruvellur High Road
Tiruninravur – 602024

Completed in 2010 Rs. 500.0 Million
2

Preparation of detail design and drawing for Skew slab bridge for a Railway flyover connection with Rail infrastructure at Angul for NALCO in East Coast Railway.

M/s RITES for NALCO
GM/ RITES, Kolkata

Completed in 2009 Rs. 3.5 Million
3

Preparation of design and drawing for construction of 3x12.2 M clear span PSC slab for railway bridge conforming to DFC loading. East coast Rly.

M/s ARSS Infrastructure Projects Ltd,
Sector‐A, Zone‐D, Plot‐38
Mancheswar Industrial Estate
Bhubaneswar‐751010, Orissa

Completed in 2010 Rs. 15.0 Million
4

Consultancy for scheme design, estimate and specification for power supply, Depot layout, Ballast less track for Hyderabad metro consisting of 3 lines having total length of 72 Km.

M/s Lersen & Toubro Limited,
Mount Poonamallee Road,
Manapakkam,
PB No.979,
Chennai – 6000089.

Completed in 2010 This is a pretender consultancy. Cost of Total Metro project was estimated as Rs.1500.0 Billion
5

Detail Survey and preparation of DPR for setting up an ICD (Integrated container Depot) at Bandamunda. South Eastern Railway.

M/s Innovative B2B Logistics Solutions Ltd.,
11th Floor, DLF Tower, 9-B, DLF Cyber City,
Phase-III, Sector- 25A,
Gurgaon - 122002.

Completed in 2010 Rs.70.0 Million.
6

Preparation of DPR with financial viability report for Rail infrastructure at Ranital station of S. E. Railway.

Sridhi Transport Co. Pvt. Ltd.,
Crystal Tower, Kaveri Road,
Sakchi,
Jamshedpur‐831 001.

Completed in 2010 Rs. 74.0 Million
7

Detail Survey and Technical Feasibility study/Project management services for Rail connectivity work at Container Freight Station, Kolkata.

M/s Balmer Lawrie
(A Govt. of India, UT),
21, Netaji Subhas Road,
Kolkata – 700001

Completed in 2011 Rs. 13.4 Million
8

Final Location survey for construction of new Rly line from Prantik to Suri (33.987Km) and geotechnical investigation etc. for construction of Flyover at Sainthia in connection with doubling from Chinpai to Sainthia. Eastern Railway

CAO/CON, Eastern Railway
14, Strand Road,
Kolkata – 700 001

Completed in 2011 Rs. 1360 Million
9

Preliminary Engineering survey  for  construction of new BG line  from  Krishnanagar – Nabadwipghat (20km) including survey for fixing of alignment for construction of an important bridge over river Bhagirathi‐ in Eastern Rly.

CAO/CON, Eastern Railway
14, Strand Road,
Kolkata – 700 001

Completed in 2011 Rs. 800.00 Million
10

Carrying out Engineering field survey and preparation of Feasibility Report and DPR for a private siding at IKRA in Asansol Division of Eastern Railway.

M/S Rashmi Cement Ltd.
Premlata Building, 6th Floor,
Shakespear sarani,
Kolkata‐700017

Completed in 2011 Rs. 55.36 Million
11

Consultancy service for preparation of DPR with financial analysis for setting up a Foundry shop for Railway Wagon / RS items.

M/s T. I. Metal Forming, Chennai
Chennai – Tiruvellur High Road
Tiruninravur – 602024

Completed in 2011 Rs. 260.0 Million
12

Final Location survey and preparation of report for construction of new BG Rly line from Dhaniakhali to Magra, Eastern Railway.

CAO/CON, Eastern Railway
14, Strand Road,
Kolkata – 700 001

Completed in 2012
13

Final Location survey and  preparation  of  report for construction of new BG Rly line from Budge to Pujali, Eastern Railway.

CAO/CON, Eastern Railway
14, Strand Road,
Kolkata – 700 001

Completed in 2012
14

Consultancy Services for preparation of Feasibility report and DPR in connection with modification and remodeling of Private Railway Siding at Sankrail , S.E. Rly

M/s Ambuja Cement  Ltd.
Kolkata office ”Indicon Viva" 
53A Lila Roy Sarani,
Kolkata‐700019

Completed in 2013 Rs. 56.0 Million
15

Feasibility Report & DPR for a private siding connecting KASIA mines from
BARBIL-BOLANI in S. E. Railway.

ESSEL Mining & Industries Ltd.
Barbil -758 035,
Keonjhar, Orissa

Completed in 2013 Rs. 447.4 Million
16

Consultancy for detail Design and drawing for Through Girder span 29.478M for Bridge No.7, span No.5, East Coast Railway

M/s Rawatsons Engineers Pvt.  Ltd.
18A, Park Street,
Kolkata – 700071

Completed in 2013 Rs. 20.0 Million
17

Detail survey and preparation of Feasibility report and DPR for additional line  in  the  Durgapur Cement Works siding at Durgapur, including detail Engineering and construction management in Eastern

M/s Birla Corporation Ltd.,
Unit : Durgapur Cement Works,
Durgapur – 713 203.

Completed in 2014 Rs. 26.26 Million
18

Consultancy services for survey  and  preparation of DPR for Common facility work including detail design and drawing at GUA in South Eastern Railway

M/s Jindal Steel and Power Ltd.
Ranchi,
Jharkhand.

Completed in 2014 Rs. 400.0 Million
19

Consultancy for survey and preparation of DPR for proposed Phase‐1 Railway siding extension of Birarajpur station in Chakradharpur Division of South Eastern Railway.

Adhunik Power & Natural Resources Ltd.
Lansdowne Tower,
2/1, Sarat Bose Road
Kolkata ‐ 700020

Completed in 2015 Rs. 30.0 Million
20

Consultancy for detail survey and preparation of DPR for proposed PFT at Kalunga in CKP Div of South Eastern Railway

Sri Mahabir Ferro Alloys Pvt. Ltd.
10C, Hungerford street,
6th floor,
Picasso Bithi,
Kolkata – 700017

Completed in 2015 Rs. 28.0 Million
21

Consultancy service for the proposed Two spur unloading siding of HPCL at Budge  Budge  in Sealdah Division of Eastern Railway. Detail survey and preparation of DPR.

Hindustan Petroleum
Corporation Ltd.
1, Graham Road,
Budge Budge,
Kolkata – 700 137

Completed in 2015 Rs. 741.0 Million
22

Detail Engineering Survey & Preparation of DPR & project management Services.

IOCL Ltd.
Engg. Department
6th Floor, Indian Oil Bhawan
Bandra (East), Mumbai - 51

Completed in 2015
23

Detail survey and preparation of Feasibility report and DPR for Private Freight Terminal at Gobra in Eastern Railway

M/s SFA Logistics Park Pvt. Ltd.
76, GT Road,
Howrah, Kolkata,
West Bengal.

Completed in 2016 Rs. 1500.0 Million
24

Project Management consultancy for construction and commissioning of siding at Andal under Eastern Railway.

M/s Birla Corporation Ltd.
Unit‐Durgapur Cement works,
Durgapur‐713 203,
West Bengal.

Completed in 2016 Rs. 40.0 Million
25

Consultancy services for survey and preparation of Feasibility Report, DPR, Detail Engineer, and Project Management & Supervision.

M/s JSW Cement Ltd.
Ankur Comples, Vill‐Jambedia,
Po‐ Sayaedpur via Salboni,
Dist‐ Midnapur,
West Benvgal‐721147

Completed in 2017 Rs. 300.0 Million
26

Consultancy services for preparation of detail survey, Feasibility Report and DPR  for construction of Brown field PFT at Nipania under Raipur Division of South East Central Railway.

M/s Suman Forwarding Agency,
Kolkata
for M/s Lafarge India Ltd.

Completed in 2017 Rs. 60.0 Million
27

Consultancy for survey & preparation of Feasibility Report, DPR, ESP for Railway siding at Barajamda of South Eastern Railway.

M/s Deepak Steel & Power Ltd.
Ispat Bhawan,
PO‐ Barbil‐758035,
Dist‐Keohnjhar,
State‐ Odisha.

Completed in 2017 Rs. 40.0 Million
28

Certification of Track & Bridges of Private Railway Siding of M/s TATa Steel at Joda (East) in S.E.Rly for 25Tonne  Axle load.

M/s  E to E  Transportation Infrastructure Pvt. Ltd.
Amrutha Varshini
325, 3rd Cross, Sector – A
Yelahanka New Town
Bengaluru – 560 064

Completed I n 2018
29

Consultancy for proposed modification to Private Railway siding at Nimpura - Gokulpur and conversion to PFT in South Eastern Railway

M/S Rashmi Cement Ltd.
Premlata Building, 6th Floor,
Shakespear sarani,
Kolkata‐700017

Completed in 2018 Rs. 258.0 Lakhs
30

Consultancy for preparation Feasibility report, DPR, Detail design, Preparation of OHE layout & Signaling layout and Land Licensing Plan for development of private siding at Nimpura- Gokkulpur under South Eastern Railway.

M/s Orissa Metaliks Pvt Ltd.
1, Garstin Place, ORBIT house,
3rd floor, Room No. 3B
Kolkata – 700 001

Completed in 2018 Rs. 20 Million
31

Modification of existing Siding of SAIL at Meghahatuburu in South Eastern Railway for provision of EIMWB

Steel Authority of India Ltd.
(A Govt. of India Undertaking)
Raw material Division
MIOM
Dist - Singhbhum(West)
Jharkhand - 833223

Completed in 2018 Rs. 100.0 Lakh
32

MEP Design consultancy works of Central Park Depot of East-West Metro for KMRCL project at Kolkata consisting of  detail design of Electric lighting, Air Conditioning and Ventilation, Fire Fighting, Water Supply and Diagram scheme for Central Depot of Metro Railway

M/s Consolidated Construction Consortium Ltd.( CCCL), Chennai.

Completed in 2018 1560.0 millions
33

Consultancy work for Project Management & construction supervision and  preparation of revised estimates, Completion drawings, Siding Agreement, Land Licensing Agreement and execution of the same,  for Rungta Mines siding between  Jaroli-Nayagarh under South Eastern Railway.

M/s Rungta Mines Limited

Jaiang Iroin & Manganese Mines, Keonjhar, -758052 State- Odisha.

Completed In 2018 Rs.25.8 millions
34

Consultancy for survey, preparation of Feasibility Report, DPR,, Detail Engineering, BOQ, Tender documents for modification/augmentation of the existing siding of TATA Metaliks at Gokulpur in Kharagpur Division of South Eastern Railway.

TATA Metaliks Limited

Vill-Mahespur, PO-Samraipur

Kharagpur, West Bengal-721 301

Completed in 2018 103.4 millions
35

Consultancy for resurvey of the additional area/land in Bada-Khirbani village and modification of DPR of Hurra-C mines with existing MGR of NTPC, Kahalgaon Eastern Rly.

NTPC Limited, Kahalgaon Super Thermal Power project Bhagalpur, Bihar

Completed in 2019 Rs.45.3. millions
36

Consultancy services of Mechanical
Workshop, Samastipur for augmentation of
manufacture of BOXNHL MBS wagon,
East Central Railway

Chief Workshop Manager
Mechanical Workshop,
East Central Railway
Samastipur
PIN-848101

Completed in October,2019 Rs.103.35 crores.